Photo Gallery
-
Continued demolition -
Vinyl siding, soffit, fascia, cornices, doors, windows, shutters, lighting installed -
-
-
Initial framing of exterior walls, continued -
Completed Main bathroom, plumbing, lighting, cabinets, countertops, and tile installed. -
Completed Dining room -
Completed Entryway -
Plumbing and concrete slab -
Completed Dining room continued -
-
Completed exterior, continued -
In progress photo of exterior -
-
-
-
-
-
-
Completed Utility room cont., two stage boiler installed, with a two stage boiler a water heater is unnecessary -
-
Shingles, fieldstone, doors, and windows complete -
Initial framing of exterior walls with windows, continued -
-
-
-
Completed Kitchen and pantry, plumbing, appliances, cabinets, and countertops installed. -
Concrete slab completed, ready for framing -
-
Rubber Roof -
-
-
-
Completed 2nd Bedroom, cont. with walk in closet -
Completed Great room. R/19 wall insulation R/50 ceiling insulation. -
-
-
-
Completed exterior with the exception of post due to winter weather -
Completed 3rd Bedroom -
Completed Great room, continued -
Completed Master bedroom -
-
-
-
Completed exterior, continued Total cost $187,000. 2296 square feet. -
-
Completed 3rd Bedroom continued with closet -
Completed Master bedroom continued with walk in closet -
Initial fieldstone around the front of the exterior -
Completed Utility room cont., forced air and HVAC 90% efficient BTUs -
Completed Great room cont., all drywall, painting, lighting, carpet, and interior trim installed. -
-
Completed 3rd Bedroom continued -
Completed 2nd Bedroom -
Completed Utility room, all electrical work, plumbing, washer, dryer, and cabinets installed. -
-
Completed exterior, continued -
Completed Hobby room -
-
-
The original home was completely destroyed in a fire. This house was rebuilt in 62 days. This is the initial demolition. -
Basement filled to prepare for pouring concrete slab -
-
-
-
-
Initial framing of exterior walls, using 2 x 6 precuts; all materials are from Mountain Hardware & Lumber -
In progress photo, door installed -
-
Architectural Steel -
In progress photo, roofing preparation -
-
Completed Master bathroom cont., plumbing, lighting, cabinets, countertops, and tile installed. -
-
-
Completed Master bathroom, plumbing, lighting, cabinets, countertops, and tile installed. -
-
-
In floor heating and concrete slab with 16 x 24 grade beam and 2” insulation -
-
-
Completed Main bathroom cont., plumbing, lighting, cabinets, countertops, and tile installed. -
-
-
-
Completed Great room, continued -
Completed exterior, continued -
Completed Kitchen, plumbing, cabinets, and countertops installed. -
Preparation for shingle installation to the new roof -
-
-
Completed Entryway, continued -
Completed 2nd Bedroom continued -
-
-
Preparation for shingle installation to the new roof, continued; and installation of energy efficient windows -
-
-
Completed Hallway, all flooring, interior doors and trim installed.